Construction Begins!

May 27th our contractor started by taking apart the building.


DSC01647.JPG.jpg

The first step was to remove the cubicles that came with the building. IMS sold them on Craig's List to add to our 100 Square Capital Campaign.


DSC01650.JPG.jpg


Shown to the left are Head of School,  Dr. Kateri Carver-Akers and long-time Board member, Marc Paradis, preparing to move  the cubicles.




DSC01649.JPG.jpg

DSC01648.JPG.jpg

The second step was to remove the old ceiling tiles to access the lighting and venting systems. The tiles are not being reused because fibers from these tiles shed over time. IMS plans to reuse materials as much as possible while guaranteeing the safety of the children and staff.


 